Changes
Jump to navigation
Jump to search
176 bytes added
, 11:07, 3 February 2022
#Connect the outputs.
#Connect the inputs.
#Connect the Can connector.
#Configure the module using LT setup.
#Apply power to the load
#Check all equipment for proper operation.