Changes
Jump to navigation
Jump to search
33 bytes added
, 26 February
Line 477: |
Line 477: |
| #Check all equipment for proper operation. | | #Check all equipment for proper operation. |
| | | |
− | ===METAFORSA module shut-off and deinstallation procedure=== | + | ===Процедура вимкнення та деінсталяції модуля METAFORSA |
| | | |
| #De-energize the module by disconnecting the circuit breaker assembly of the load power supply and METAFORSA module supply unit. Verify the voltage is absent on the terminals (1), (2) of the connector wires and on the input terminals of the supply unit. | | #De-energize the module by disconnecting the circuit breaker assembly of the load power supply and METAFORSA module supply unit. Verify the voltage is absent on the terminals (1), (2) of the connector wires and on the input terminals of the supply unit. |