Difference between revisions of "Translations:Metaforsa 3/3.plus/77/en"
Jump to navigation
Jump to search
(Importing a new version from external source) |
(No difference)
|
Latest revision as of 10:11, 13 March 2024
- ensure the outputs are properly configured in the application (see System Setup Instructions);
- check the connection is correct in accordance with table 2 and paragraph 3.6;
- ensure the power is supplied to the input power contact , i.e. all circuit breaker assembly are ON.
- verify the operability of the connected equipment.