Changes
	
		
		
		
		
		
		Jump to navigation
		Jump to search
		
	
	
	
		63 bytes removed
	
		,  08:12, 11 August 2021
	
 
| Line 88: | 
Line 88: | 
|   | ==Module installation and connection procedure==  |   | ==Module installation and connection procedure==  | 
|   | #Install the module in the switchboard on the DIN rail and fix it with the special latch on the module base.  |   | #Install the module in the switchboard on the DIN rail and fix it with the special latch on the module base.  | 
|   | + | #Connect the X1 connector.  | 
|   | #Connect the CAN connector.  |   | #Connect the CAN connector.  | 
| − | #Connect the X1 connector.
  |   | 
|   | #Configure the module using LT setup.  |   | #Configure the module using LT setup.  | 
| − | #Apply power to the load.
  |   | 
|   | #Check all equipment for proper operation.  |   | #Check all equipment for proper operation.  | 
|   |  |   |  | 
|   | ==Module shut-off and deinstallation procedure==  |   | ==Module shut-off and deinstallation procedure==  | 
| − | #Disconnect the power from the load.  | + | #Disconnect the CAN connector.  | 
|   | #Disconnect the X1 connector.  |   | #Disconnect the X1 connector.  | 
| − | #Disconnect the CAN connector.
  |   | 
|   | #Remove the module from the DIN rail, releasing the latch at the bottom of the module base.  |   | #Remove the module from the DIN rail, releasing the latch at the bottom of the module base.  | 
|   |  |   |  |