Translations:BW-BC-PW/10/en
		
		
		
		Jump to navigation
		Jump to search
		
- Connect the outputs.
- Connect the inputs.
- Connect the CAN connector.
- Configure the module using LT setup.
- Apply power to the load.
- Check all equipment for proper operation.