Changes

395 bytes added ,  09:54, 22 July 2021
Line 188: Line 188:  
|err1 = 1
 
|err1 = 1
 
|err2 = 1}}
 
|err2 = 1}}
 +
 +
==Module installation and connection procedure==
 +
 +
#Connect the outputs.
 +
#Connect the inputs.
 +
#Connect the Can connector.
 +
#Configure the module using LT setup.
 +
#Apply power to the load
 +
#Check all equipment for proper operation.
 +
 +
==Module shut-off and deinstallation procedure==
 +
 +
#Disconnect the power from the load
 +
#Disconnect the CAN connector.
 +
#Disconnect the inputs.
 +
#Disconnect the outputs.