Translations:Metaforsa 3/3.plus/77/en

  • ensure the outputs are properly configured in the application (see System Setup Instructions);
  • check the connection is correct in accordance with table 2 and paragraph 3.6;
  • ensure the power is supplied to the input power contact , i.e. all circuit breaker assembly are ON.
  • verify the operability of the connected equipment.