Changes

m
no edit summary
Line 58: Line 58:     
<!--T:10-->
 
<!--T:10-->
#Connect the outputs.
+
#Connect the inputs and outputs.
#Configure the module using LT setup.
+
#Configure the module using LT Setup.
 
#Apply power to the load.
 
#Apply power to the load.
 
#Check all equipment for proper operation.
 
#Check all equipment for proper operation.
Line 67: Line 67:  
<!--T:12-->
 
<!--T:12-->
 
#Disconnect the power from the load.
 
#Disconnect the power from the load.
#Disconnect the outputs.
+
#Disconnect the inputs and outputs.
editor, Interface administrators, Administrators, translation-admin, translator
9,706

edits