Changes

Created page with "===METAFORSA-modulets lukning og afinstallationsprocedure==="
Line 475: Line 475:  
#Kontroller alt udstyr for korrekt funktion.
 
#Kontroller alt udstyr for korrekt funktion.
   −
===METAFORSA module shut-off and deinstallation procedure===
+
===METAFORSA-modulets lukning og afinstallationsprocedure===
    
#De-energize the module by disconnecting the circuit breaker assembly of the load power supply and METAFORSA module supply unit. Verify the voltage is absent on the terminals (1), (2) of the connector wires and on the input terminals of the supply unit.
 
#De-energize the module by disconnecting the circuit breaker assembly of the load power supply and METAFORSA module supply unit. Verify the voltage is absent on the terminals (1), (2) of the connector wires and on the input terminals of the supply unit.
editor, Interface administrators, Administrators, translation-admin, translator
9,706

edits