Changes
Jump to navigation
Jump to search
7 bytes removed
, 11 March
Line 524: |
Line 524: |
| *zkontrolujte integritu vedení položených k senzorům. | | *zkontrolujte integritu vedení položených k senzorům. |
| | | |
− | ===The auxiliary equipment does not operate:=== | + | ===Přídavné zařízení nefunguje:=== |
| | | |
| *check the connection is correct in accordance with table 2 and paragraph 3.8-9; | | *check the connection is correct in accordance with table 2 and paragraph 3.8-9; |