Changes
Jump to navigation
Jump to search
2 bytes removed
, 5 April
Line 505: |
Line 505: |
| *verificare l'integrità delle linee posate ai sensori. | | *verificare l'integrità delle linee posate ai sensori. |
| | | |
− | ===The auxiliary equipment does not operate:=== | + | ===L'attrezzatura ausiliaria non funziona:=== |
| | | |
| *check the connection is correct in accordance with table 2 and paragraph 3.8-9; | | *check the connection is correct in accordance with table 2 and paragraph 3.8-9; |