Changes
Jump to navigation
Jump to search
274 bytes added
, 12:14, 6 January 2022
*Install the module in the switchboard on the DIN rail and fix it with the special latch on the module base.
*Connect the CAN connector.
*Connect the X1-X3 connectors.
*Configure the module using LT setup.
*Apply power to the load.
*Check all equipment for proper operation.