Changes
Jump to navigation
Jump to search
177 bytes added
, 13:31, 8 January 2022
#Connect the outputs.
#Connect the inputs.
#Connect the CAN connector.
#Configure the module using LT setup.
#Apply power to the load.
#Check all equipment for proper operation.