Changes

Jump to navigation Jump to search
No change in size ,  07:20, 27 July 2021
Line 187: Line 187:  
*Install the module in the switchboard on the DIN rail and fix it with the special latch on the module base.
 
*Install the module in the switchboard on the DIN rail and fix it with the special latch on the module base.
 
*Connect the CAN connector.
 
*Connect the CAN connector.
*Connect the channels (1-18).
+
*Connect the channels (1-10).
 
*Configure the module using LT setup.
 
*Configure the module using LT setup.
 
*Apply power to the load.
 
*Apply power to the load.

Navigation menu