Changes

Jump to navigation Jump to search
63 bytes removed ,  08:11, 11 August 2021
no edit summary
Line 85: Line 85:  
==Module installation and connection procedure==
 
==Module installation and connection procedure==
 
#Install the module in the switchboard on the DIN rail and fix it with the special latch on the module base.
 
#Install the module in the switchboard on the DIN rail and fix it with the special latch on the module base.
 +
#Connect the X1 connector.
 
#Connect the CAN connector.
 
#Connect the CAN connector.
#Connect the X1 connector.
   
#Configure the module using LT setup.
 
#Configure the module using LT setup.
#Apply power to the load.
   
#Check all equipment for proper operation.
 
#Check all equipment for proper operation.
    
==Module shut-off and deinstallation procedure==
 
==Module shut-off and deinstallation procedure==
#Disconnect the power from the load.
+
#Disconnect the CAN connector.
 
#Disconnect the X1 connector.
 
#Disconnect the X1 connector.
#Disconnect the CAN connector.
   
#Remove the module from the DIN rail, releasing the latch at the bottom of the module base.
 
#Remove the module from the DIN rail, releasing the latch at the bottom of the module base.
  

Navigation menu