Translations:BW-RGB/12/en

From Larnitech wiki page
Jump to navigation Jump to search
  1. Connect the outputs.
  2. Connect the CAN connector.
  3. Configure the module using LT setup.
  4. Apply power to the load.
  5. Check all equipment for proper operation.