Translations:DW-LC18/37/en

From Larnitech wiki page
Jump to navigation Jump to search
  • Install the module in the switchboard on the DIN rail and fix it with the special latch on the module base.
  • Connect the CAN connector.
  • Connect the channels (1-18).
  • Configure the module using LT setup.
  • Apply power to the load.
  • Check all equipment for proper operation.