Translations:Metaforsa MF-10/82/en

From Larnitech wiki page
Jump to navigation Jump to search
  • ensure the outputs are properly configured in the application (see System Setup Instructions);
  • check the connection is correct in accordance with table 2 and paragraph 3.6;
  • ensure the power is supplied to the input power contact , i.e. all circuit breaker assembly are ON.
  • verify the operability of the connected equipment.