Changes
Jump to navigation
Jump to search
63 bytes removed
, 08:11, 11 August 2021
Line 85: |
Line 85: |
| ==Module installation and connection procedure== | | ==Module installation and connection procedure== |
| #Install the module in the switchboard on the DIN rail and fix it with the special latch on the module base. | | #Install the module in the switchboard on the DIN rail and fix it with the special latch on the module base. |
| + | #Connect the X1 connector. |
| #Connect the CAN connector. | | #Connect the CAN connector. |
− | #Connect the X1 connector.
| |
| #Configure the module using LT setup. | | #Configure the module using LT setup. |
− | #Apply power to the load.
| |
| #Check all equipment for proper operation. | | #Check all equipment for proper operation. |
| | | |
| ==Module shut-off and deinstallation procedure== | | ==Module shut-off and deinstallation procedure== |
− | #Disconnect the power from the load. | + | #Disconnect the CAN connector. |
| #Disconnect the X1 connector. | | #Disconnect the X1 connector. |
− | #Disconnect the CAN connector.
| |
| #Remove the module from the DIN rail, releasing the latch at the bottom of the module base. | | #Remove the module from the DIN rail, releasing the latch at the bottom of the module base. |
| | | |