Changes

m
no edit summary
Line 59: Line 59:  
<!--T:9-->
 
<!--T:9-->
 
#Connect the outputs.
 
#Connect the outputs.
#Configure the module using LT setup.
+
#Configure the module using LT Setup.
 
#Apply power to the load.
 
#Apply power to the load.
 
#Check all equipment for proper operation.
 
#Check all equipment for proper operation.
editor, Interface administrators, Administrators, translation-admin, translator
9,750

edits