Open main menu
Home
How to do
Din rail devices
Box devices
Sensors
Multiroom
Applicatin
XML
Additional info
Log in
Settings
Larnitech wiki page
Search
Changes
← Older edit
Newer edit →
DW-LC10
(view source)
Revision as of 07:20, 27 July 2021
No change in size
,
07:20, 27 July 2021
→Module shut-off and deinstallation procedure
Line 195:
Line 195:
*Disconnect the power from the load.
*Disconnect the power from the load.
−
*Disconnect the channels (1-
18
).
+
*Disconnect the channels (1-
10
).
*Disconnect the CAN connector.
*Disconnect the CAN connector.
*Remove the module from the DIN rail, releasing the latch at the bottom of the module base.
*Remove the module from the DIN rail, releasing the latch at the bottom of the module base.
Erich
Bureaucrats
,
Interface administrators
,
Administrators
, translator
1,970
edits