Changes
Jump to navigation
Jump to search
5 bytes removed
, 11 March
Line 476: |
Line 476: |
| # Zkontrolujte správné fungování všech zařízení. | | # Zkontrolujte správné fungování všech zařízení. |
| | | |
− | ===METAFORSA module shut-off and deinstallation procedure=== | + | ===Procedura vypnutí a deinstalace modulu METAFORSA=== |
| | | |
| #De-energize the module by disconnecting the circuit breaker assembly of the load power supply and METAFORSA module supply unit. Verify the voltage is absent on the terminals (1), (2) of the connector wires and on the input terminals of the supply unit. | | #De-energize the module by disconnecting the circuit breaker assembly of the load power supply and METAFORSA module supply unit. Verify the voltage is absent on the terminals (1), (2) of the connector wires and on the input terminals of the supply unit. |