Changes
	
		
		
		
		
		
		Jump to navigation
		Jump to search
		
	
	
	
		13 bytes added
	
		,  15:36, 4 March 2024
	
 
| Line 475: | 
Line 475: | 
|   | #Verifique todos os equipamentos quanto ao funcionamento adequado.  |   | #Verifique todos os equipamentos quanto ao funcionamento adequado.  | 
|   |  |   |  | 
| − | ===METAFORSA module shut-off and deinstallation procedure===  | + | ===Procedimento de desligamento e desinstalação do módulo METAFORSA===  | 
|   |  |   |  | 
|   | #De-energize the module by disconnecting the circuit breaker assembly of the load power supply and METAFORSA module supply unit. Verify the voltage is absent on the terminals (1), (2) of the connector wires and on the input terminals of the supply unit.  |   | #De-energize the module by disconnecting the circuit breaker assembly of the load power supply and METAFORSA module supply unit. Verify the voltage is absent on the terminals (1), (2) of the connector wires and on the input terminals of the supply unit.  |